← Control Room 85 · Factory Governance
Mission register · English LTR
STATE · FULL DESIGN CLOSURE COMPLETE — READY WITH CONDITIONS (see 111)

Yalla Thailand Full Design Closure — Mission Register

Governance record for mission YALLA-THAILAND-FULL-DESIGN-CLOSURE-01. Supersedes the prior handoff state on this workspace. This is a register, not a redesign: it records scope, naming, and sequencing decisions as they are made and closes when the closure report ships.

A. Workspace state change

Prior state MASTER_WORKSPACE_READY_FOR_GITHUB_IMPORT (recorded 22 Aug 2026, github.md and page-inventory.json) is held open. Owner directed: hold the import, reopen this workspace as the authoring surface for the full closure mission before any tag is cut or any import runs. No GitHub import has been executed. No tag has been cut. The 53-file / 8-destination import manifest frozen on 22 Aug remains valid and unexecuted — this mission adds to it, it does not discard it.

B. Naming ruling — Yalla Bina → Yalla Beena

Ruling 5.3 is superseded by explicit owner instruction this pass. Prior ruling: "Yalla Bina — DISTINCT PRODUCT, not absorbed, not redesigned." New ruling: Yalla Beena is the current, successor display name — Arabic-first Thailand Travel Companion, full lifecycle from Before Thailand through Departure. "Yalla Bina" remains valid only as a historical/frozen provenance identifier.

  • Frozen family 15 Yalla Bina family, 31–33, 03C is NOT rewritten or restyled. It becomes historical predecessor material — same additive pattern already used for gen-1 Public Website (23 → superseded by 42).
  • New Beena work this pass (Arrival Mode, Show-to communication cards, My Trip planning extensions) is authored fresh under the Yalla Beena name as a successor/additive release, cross-linking back to the 15/31–33 predecessor rather than replacing it in place.
  • Root domain, other current names unchanged: yallathailand.net · Yalla Ne'raf (Local Knowledge) · Yalla Nesafer (Trips & Experiences) · Yalla Agent · Yalla Academy · Yalla Media Studio · Yalla Content Intelligence · Yalla OS.

C. Scope and sequencing this pass

DomainDepthProof barStatus
{{ r.domain }} {{ r.depth }} {{ r.proof }} {{ r.status }}

D. Maturity labels in use

CONCEPT · VALIDATED · FROZEN · IMPLEMENTED_NOT_LIVE · LIVE · GATED · BLOCKED. Every screen authored in this mission starts at CONCEPT. Nothing is labelled LIVE because code exists or tests pass — that label requires implementation-alignment evidence per the existing gate on this workspace.

E. Sequencing log

{{ l }}

F. Explicit non-goals this pass

  • No GitHub import executed. No tag cut, mutated, or superseded.
  • No code implemented. No new authoring workspace created.
  • Frozen Passenger Stat Strip and Schedule Strip (34 Voucher Desk Passenger and Schedule Proof) untouched — owner-accepted Aug 2026, changed only for a verified implementation defect.
  • No restyle of any already-accepted product family without a real product/business reason recorded in this register.